Mechanical services

Stainless steel, carbon steel, PVC, CPVC, ductile iron, copper process piping, HVAC; equipment supply and installation (i.e.: JMI Actiflo, Degremont Aquadaf, polymer/alum/bisulphate/hydrated lime/fluoride/corrosion inhibitor chemical packages, AWI under-drains, sluice gate systems, chain & flights, gaseous chlorine, etc.); filter media (sand, anthracite, GAC & PAC); clarifiers, UV disinfection, membrane packages, pumps, agitators, hydraulics, pneumatic systems, valves & actuators, PLC and DCS instrumentation, SCADA, flow meters; and all required underground distribution systems such as gas, water and sewer.

List of Recent projects


Mattagami River Wastewater Pollution Control Plant (2013-2015)
The upgrade to the plant consists of the construction and installation of new aeration tanks, fine bubble aeration blowers and a diffuser. The upgrade also involves some secondary tanks and sludge collectors, scum and sludge pumping. A new secondary treatment building will be built to house a new raw sewage pumping station. Also included will be upgrades to digesters, screening and grit, modification to the existing piping and installation of associated new piping


Wanapitei Water Treatment Plant & Intake Pump House (2015)
Demolition, new 200hp vertical turbine pump, sluice gates, stop logs, filter to waste piping, valves, lime storage new dust collection system, vibration and sonar measuring device.


Whitney – Tisdale Sanitary System Upgrades (2015)
Fabrication and installation of SS piping headers, self-priming centrifugal sewage pumps and valves.


List of Completed Projects


Timmins Water Filtration Plant (2008)
Timmins water filtration plant upgrades project included modifications of the PH balancing mixing chamber to adapt two new Actiflo clarifying trains replacing the existing Degremont clarifiers, Aluminum Sulphate, Polyfloc & Chlorine Gas metering equipment, MicroFloc trains converted to residual management system and two below grade equalization tanks with transfer pumps.


Smiths Falls Water Treatment Plant (2009-2010)
Located in Smiths Falls, Ontario the water treatment plant facility is comprised of a raw water well and low lift pump system. AquaDAF System, dual media filters complete with filter backwash pumps and blowers, chemical facilities, administrative facilities, UV disinfection system, residuals management system, high lift pumps.


Eastern Waste Water Treatment Plant New Brunswick (2009-2011)
Situated in Saint- John, NB the Hazen Creek Wastewater Treatment Plant on Red Head Road in Saint John, NB. The work included construction of a 35 000 cubic meter per day sewage treatment plant and decommissioning and demolition of the plant that had once existed there. Work included the supply and installation of preliminary treatment equipment, primary clarifiers, aeration tanks, secondary clarifiers, UV equipment, process equipment, soda ash systems, aeration diffusers, bio-filter system, commissioning and installation of mechanical and electrical services.


Kirkland Lake Wastewater Treatment Plant (2012-2014)
The new Kirkland Lake Wastewater Treatment Plant was constructed with a capacity of 13 680 m cubed/d average daily flow and 40 890 m cubed/d peak flow. Work included construction of new headworks area, new filtration and UV disinfection area, 2 aeration tank and circular clarifier structures, Administration and Process building, Dewatering Building, new aerated sludge holding tanks, and new plant effluent pipe and outfall structure. Together, with all required electrical, mechanical, instrumentation and controls, a completely new wastewater treatment plant was designed and opened in full operation in 2014.

  • we always strive for continual improvement and success.

  • we can make your vision become a reality.

  • we want to complete the job properly for you the first time, not fixing it for you later.